Bagpuss Renovation

Bagpuss, complete with engine, trailer and some boxes of parts, was purchased on eBay in late July 2018. We collected her at the start of August. Other than the traffic this went fairly smoothly.

IMG_20180804_105522.jpg
Collecting Bagpuss – Hereford area – 04/08/2018

We launched her at Pike Lock slipway on the same day.

04/08/2018

  • Towed home & Launched
  • Attached outboard motor to boat
  • Started wiring up outboard motor
IMG_20180804_153724.jpg

08/08/2018

  • Door handle added to front cabin doors on the outside.
  • Sanded & varnished exterior wood.
  • Attached outboard controls more securely.

09/08/2018

  • More sanding & varnishing
  • Paint stripped the mast

11/08/2018

  • Finished wiring outboard & started for first time

15/08/2018

  • Reattached loose connections in electrical box
  • Tested 12v sockets, cabin and navigation lights – all powered
  • Sanded & varnished the mast and rear bed frame
  • Wired in water pump to tap micro-switch and power

18/08/2018

  • Engine test run from Pike Lock to Newtown and back

19/08/2018

  • Sand & varnish cockpit wood
  • Sand & paint steps and electrical box cover

22/08/2018

  • More varnish coats on rear cabin bed base & electrical box cover
  • New headlamp fitted

23/08/2018

  • Tested feasibility of electric propulsion by mounting an old 48lb thrust 12v outboard motor. Reached 3.3mph.

25/08/2018

  • More sanding & painting in toilet room

27/08/2018

  • Even more sanding & painting

29/08/2018

  • Clean & sand front cabin
  • Varnish front storage covers
  • Varnish toilet room
  • Fill gaps around cockpit area
  • Remove empty gas canister

30/08/2018

  • New 4.5kg gas canister purchased, fitted & tested
  • More varnish coats on front storage covers
  • More sanding rear cabin & floor

01/09/2018

  • Sanding!

05/09/2018

  • Varnishing rear cabin & floor

06, 08, 09 & 12/09/2018

  • Varnishing!

13/09/2018

  • Added 12v socket for front cabin to replace one of the lights.
  • Rear light replaced
  • Varnishing!

15 & 26/09/2018

  • Varnishing!

03/10/2018

  • Varnishing!
  • Seal front windows & rear port-side cockpit window
  • New outboard delivered

06/09/2018

  • Varnishing!

10/10/2018

  • Secure loose cabling in toilet room
  • Seal front of cockpit

13/10/2018

  • Remove 2-stroke outboard & remotes
  • Sold 2-stroke outboard & remotes

31/10/2018

  • New outboard remotes delivered

 

09/06/2019

  • Privacy film added in toilet compartment

IMG_20190609_115348.jpg

22/06/2019

  • Resealed centre cockpit edges

06/07/2019

  • Sanding & painting of damaged wood
  • Cheap unreliable LED ceiling light removed
  • Round wall light wired in
  • Battery meter fitted

IMG_20190706_165816.jpgIMG_20190706_124440.jpgIMG_20190706_122419.jpg